← All Articles Codes & Permitting

Zoning, Building Codes & Permitting: What Is the Difference?

By Oliver Milot

Zoning requirements, building codes, and permit review serve different purposes. Understanding how they relate can help identify potential project constraints early in the planning process.

Zoning requirements, building codes, and the permitting process are often discussed together, but they address different aspects of a construction project. Understanding the distinction can make it easier to determine which approvals may be required and when they should be considered.

Zoning generally regulates how land and buildings may be used and developed within a community. Requirements may address permitted uses, setbacks from property lines, building height, lot coverage, parking, signs, accessory structures, and other aspects of development.

A project can comply with the building code and still have a zoning issue. For example, an addition may be structurally sound and code compliant but extend into a required setback. In that situation, zoning relief or a redesign may be necessary before the project can proceed.

Building codes address the safety and performance of buildings. Depending on the project, requirements may apply to structural design, fire protection, exits, stairs, guards, accessibility, energy efficiency, plumbing, mechanical systems, electrical work, and numerous other aspects of construction.

The applicable code requirements can depend on several factors, including building use, size, construction type, occupancy, location, and the extent of the proposed work. Existing buildings can require additional analysis because alterations may need to be evaluated in relation to both existing conditions and current requirements.

Permitting is the administrative process through which the appropriate authority reviews the proposed work. Permit applications commonly include drawings, forms, construction information, and other documentation needed to demonstrate the proposed scope of work and applicable code compliance.

Some projects involve approvals beyond a standard building permit. Depending on the property and scope, there may be zoning review, planning board review, historic review, health department approvals, conservation requirements, utility coordination, fire department review, or other local and state requirements.

The order of these approvals can matter. A building department may not be able to issue a building permit until required zoning or planning approvals have been obtained. Identifying the applicable process early can prevent unnecessary redesign or delays.

For straightforward work, the approval process may be relatively simple. Larger additions, changes of use, commercial work, alterations to existing buildings, and projects involving unusual site conditions can require more coordination.

A useful first step is therefore to review the property, proposed scope, and local requirements before drawings are substantially developed. Early code and zoning review can help establish the framework within which the design can proceed and can identify potential approval issues before they become more difficult or expensive to address.

Have a Project in Mind?

Discuss Your Project

Contact Milot Designs to discuss existing conditions, design goals, code or permitting questions, and the appropriate next steps for your project.

Contact Milot Designs